Previous Projects

Richard Challoner School - New Malden

Primary School after remodelling

65 workstation Learning Resource Centre - 2011

Primary school ICT cuite after remodelling

65 workstation Learning Resource Centre - 2011

Latest project at Richard Challoner School in New Malden was a 65 Workstation Learning Resource Centre installation: - 65 1m workstations gives plenty of space for many pupils to use both a computer and books at the same time. A Librarians desk in the centre of the room allows a view of every workstation for better discipline.

Primary School after remodelling

AV Floor Cabinet - 2011

Primary School after remodelling

Comproom Mount and Casio Projector Bundle

Upgrading the school hall audio system; installing a floor rack cabinet to give lockable storage for the audio system and generally tidying up the cables. Various classroom AV installations over the last 6 years. More recently, replacing old projectors with Casio XJ-A140's and Comproom Mounts. Where the old projector had been installed safely in the past, the school staff are able to install the projector and mount themselves, saving money.

Primary School - Merton

Primary school ICT cuite after remodelling

Lighting installation - 2011

Primary School after remodelling

Professional lighting truss

Lighting Installation in a primary school hall in Merton. Easy to use lighting controller allows any colour to be chosen remotely from the 24-channel DMX controller. Cost effective solution using LED lighting with a low running cost and no filaments to blow.

Glyn School - Ewell

Primary School after remodelling

AV installations throughout school - 2008

Primary school ICT cuite after remodelling

Discreet Sports Hall AV Installation - 2009

Sports Hall AV system installation at Glyn School in Ewell: - Cages were designed for the Ohm speakers to protect them from cricket balls. Three pairs of speakers were spaced down the hall using a digital delay system to avoid a "Paddington Station annoucement effect". A powerful NEC projector and 4m motorised screen were installed to be used at a touch of a button when needed to save setting up portable equipment every time the hall is used for assemblies.

Primary School after remodelling

Cage for Ohm Speakers

Primary School after remodelling

School Hall Sound System - 2009

School Hall AV installation using eight Ohm speakers (four at the front, four at the back) and switching to allow the school to change the speakers in use depending on where the assembly or performance is presented from - on the main stage at the front / at the side on the left / or in the centre of the hall, and to minimise feedback.

Secondary School - Swanscombe

Primary school ICT cuite after remodelling

AV installations - 2010

Primary School after remodelling

ICT suite - 2010

Various AV installations in a secondary school in Swanscombe. ICT Suite for 30 pupils.

Primary School - South Norwood

Primary school ICT cuite after remodelling

ICT suite - 2001

Primary School after remodelling

Remodelled ICT suite - 2010

ICT suite in a primary school in the Croydon area. Originally created in 2001, for 30 pupils working at 15 computers. Remodelled in 2010 using the same benches and Legsafes. An extra bench was added to allow an extra 15 computers to be added to give one computer per pupil. Size of the room: 49m², Number of computers: 30.

Secondary School - Chelmsford

Primary school ICT cuite after remodelling

Library benching - 2005

Primary School after remodelling

6th Form Study Area - 2010

Range of projects in a secondary school in Chelmsford including ICT suites, library benching, and 6th form study area.

 

Back to Home

 

 
Contact Us | About Us | Terms & Conditions | Privacy Policy | Site Map
All rights reserved. © 2007-2014 Comproom Limited. VAT Reg: 749-7183-84 Registered in England: 3890700
All prices quoted on this website exclude VAT and are subject to availability of parts from manufacturers. E & OE